Search results for environmental assessment

post:

Report from ACI-NA Environmental Affairs Conference

…ACI-NA’s Annual Environmental Affairs Conference was held this week in Halifax, NS. The agenda was robust and featured several innovations, including the use of TurningPoint polling technology and providing…

Read More »

project:

NEC FUTURE Program Passenger Rail Corridor Investment Plan

…1 Environmental Impact Statement under NEPA. Using the FRA High-Speed Ground Transportation Noise and Vibration Impact Assessment and U.S. Federal Transit Administration Transit Noise and Vibration Impact Assessment guidance manuals,…

Read More »

project:

On-Call Consulting, Dallas Area Rapid Transit

…architectural acoustics, and construction noise and vibration issues. HMMH subsequently provided noise and vibration consulting services during both the environmental assessment and final design phases of the Light Rail Transit…

Read More »

bio:

Diana B. Wasiuk

Environmental Assessment for the 8.5-billion-dollar capital improvement program at O’Hare International Airport and the North Texas Metroplex Environmental Assessment under the FAA’s Optimization of Airspace Procedures in the Metroplex (OAPM)…

Read More »

bio:

Scott Polzin, PMP

…focus of his technical experience has been delivering National Environmental Policy Act (NEPA) compliance documents, including environmental impact statements (EISs), environmental assessments (EAs), and categorical exclusions (CatExs). His current focus…

Read More »

experience:

Aviation

Environmental issues constrain airports’ ability to grow. Since our founding, airports have turned to HMMH to tackle the nation’s most challenging environmental issues. In the 1980s, that issue was…

Read More »

post:

Moon Power: HMMH Moves Into a New and Exciting Field

…the next step is to prepare a project concept, undertake baseline environmental data collection, and conduct analyses of potential impacts from the project. In anticipation of this next phase, Edgartown…

Read More »

bio:

Robert C. Mentzer, Jr.

…of noise contours for more than 50 airports, including noise elements of Part 150 Land Use Compatibility Planning Studies, Part 161 Noise, and Access Restriction Studies, Environmental Assessments, Environmental Impact…

Read More »

project:

Dulles Airport Air Cargo Connector Environmental Assessment

assessment of carbon monoxide traffic emissions; the worst-case carbon monoxide ground level impacts were estimated at receptor locations in close proximity to the four worst-case intersections and interchanges using the…

Read More »

project:

MassDOT Route 3 South Transportation Improvements Environmental Notification

…minimize the time and cost for the study, HMMH used the results of the 2002 Route 3 Improvements Environmental Assessment/Supplemental Draft Environmental Impact Report and current aerial photography to evaluate…

Read More »