Search results for southwest corridor

1 2 3 4

project:

Denver Regional Transit District FasTracks Program

…to our work under the PSC contract, HMMH has conducted noise and/or vibration impact assessments for the following Denver RTD projects: Southeast (T-REX) Light Rail Corridor Southwest Light Rail Corridor

Read More »

post:

TBT: Boston’s Southwest Corridor

…incredible development to an otherwise neglected part of the city – including a lovely linear Southwest Corridor Park and expansion of Northeastern University. And eventually the Big Dig addressed some…

Read More »

project:

Noise and Vibration Consulting, Charlotte Area Rapid Transit Light Rail System

…and Southwest Corridor Light Rail Projects. Detailed noise and vibration analyses were performed for the Environmental Impact Statements in accordance with the guidelines set forth by the U.S. Federal Transit…

Read More »

project:

On-Call Consulting, Denver Regional Transit District

…to determine the effectiveness of Tire Derived Aggregate (TDA, or shredded tires) as a vibration mitigation measure on the Denver Southeast (T-REX) Light Rail Corridor. Evaluated the noise impacts of…

Read More »

project:

NEC FUTURE Program Passenger Rail Corridor Investment Plan

…NEC FUTURE is a major initiative of the U.S. Federal Railroad Administration (FRA) to develop an integrated passenger rail transportation solution for the Northeast Corridor (NEC). This complex study…

Read More »

post:

Trains and Planes

…and Barcelona (once the busiest air corridor in the world) has gone from 90% of the passengers on planes to over 50% of the passengers now on trains. In the…

Read More »

project:

On-Call Consulting, Dallas Area Rapid Transit

…(LRT) extensions along the Northeast Corridor to Garland and along the North Central Corridor to Plano. HMMH services on these projects included baseline community noise monitoring, ground-borne vibration propagation testing,…

Read More »

project:

MassDOT Route 3 South Transportation Improvements Environmental Notification

…The proposed project involved the addition of High-Occupancy Toll (HOT) lanes to the Route 3 South corridor between Interstate 93 in Braintree and Exit 11 in Duxbury, Massachusetts. To…

Read More »

post:

Solar Farm at Indianapolis International Airport

…on Phase I which is proposed in the southwest area of the airport near the I-70 interchange. In the summer of 2010 when the Indianapolis Airport Authority (IAA) was considering…

Read More »

post:

Congratulations Carl!

…most of a sweltering summer measuring noise in downtown Houston and along the Southwest Freeway corridor. I learned a lot about how transit is planned, the differences between transit noise…

Read More »
1 2 3 4