bio:
…and NEPA adherence related to 14 CFR Part 150. Joe also has extensive experience with international work; ranging in value from less than $10,000 up to $1.5 million for a…
Read More »bio:
…Statements, Airport Master Plan Studies, and other studies concerning airport noise. Robert is currently managing several Part 150 studies, On-Call Service contracts, and NEPA studies in Florida, North Carolina, Tennessee,…
Read More »project:
…previous NEPA or Air Installations Compatible Use Zones (AICUZ) efforts at the installation. Using the Department of Defense’s (DoD) NOISEMAP (NMAP), HMMH modeled proposed RQ-4 Global Hawk and MQ-1 Predator…
Read More »news:
…wing aircraft, helicopters) Operations (e.g., arrivals, departures, training circuits) DNL (Day-Night Average Sound Level noise metric) Averaging (e.g., annual-average day) Decision-making noise metrics Communication NEPA/land use noise thresholds Noise thresholds…
Read More »bio:
…technical documents, supervising staff, and assisting with marketing and business development. Through continuous project related experience with NEPA documentation and analysis, Bob has participated in the preparation of many environmental…
Read More »project:
HMMH completed all analysis and documentation for the noise section of an Environmental Assessment (EA) for proposed changes to the Airport Layout Plan (ALP) at Canyonlands Field Airport…
Read More »project:
HMMH evaluated airspace and procedural design proposals for an Environmental Assessments (EA) at Chicago Midway International Airport (MDW). The Project involved environmental analysis of proposed RNAV/RNP air traffic…
Read More »project:
HMMH was the prime consultant on the FAA’s NextGen Environmental Support Services Contract, and was tasked with evaluating airspace and procedural design proposals in an Environmental Assessment (EA)…
Read More »project:
Working in collaboration with the prime consultant and the Alaska Energy Authority, HMMH provided air quality support services on the Federal Energy Regulatory Commission (FERC) licensing process for…
Read More »project:
HMMH conducted a greenhouse gas (GHG) emission analysis for this mixed-use development project located adjacent to North Station in Boston, MA. Carbon dioxide emissions were estimated for direct…
Read More »